Well construction method "ReWell(R) method"
We will find the water vein and construct a new well!
The "ReWell(R) Method" conducts water vein surveys before construction to avoid risks such as "digging a well but not finding water," selecting specific locations based on the results, and proposing and constructing wells that match the characteristics and intended use of the water vein. We can create wells tailored to customer needs, from small to large scale. Please feel free to contact us. 【Features】 ■ Applicable to small-diameter wells (φ400–500mm) ■ Can be transported and constructed in narrow spaces *For more details, please download the PDF or feel free to contact us.
- Company:内外地下開発
- Price:Other